Changes between Version 45 and Version 46 of MonthlyReports


Ignore:
Timestamp:
09/19/2012 10:53:09 AM (7 years ago)
Author:
jkantor
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • MonthlyReports

    v45 v46  
    1010Each of these reports may be viewed by navigating to the the link in docushare and selecting the action (blue down arrow) to view as HTML or PDF. 
    1111 
    12 Listing of the Winter 2012 Release monthly report input pages: 
     12The DM project uses a web-based tool to report status against plans in the LSST Project Management Control System (PMCS).  The tool can be accessed at: 
     13 
     14[https://www.lsstcorp.org/LSSTStatus/Login.aspx  LSST Status Reporting Tool] 
     15 
     16Instructions for the tool can be accessed via link on the tool login page. 
     17 
     18Up to to Winter 2012, this status was collected via trac wiki pages. These are listed below purely for historical reasons. 
     19 
     20Winter 2012 Release 
    1321 
    1422 * November, 2011: [wiki:W12Report20111115 Winter 2012] 
    1523 * October, 2011: [wiki:W12Report20111015 Winter 2012] 
    16  
    17 Note: PT 1.3 aka Winter12 status will be handled via trac tickets status and summarized here.  After September, MSE will be planned/statused in PMCS. 
    1824 
    1925Listing of the DC3b Performance Test 1.1 and 1.2, Mgt/SE Team monthly report input pages: