     1[[TOC(depth=2)]] 
     2 
     3Previous month [wiki:PT1_2Report20110615 PT1.2] - [wiki:MSEReport20110615 Mgt/SE] 
     4 
     5Current month [wiki:PT1_2Report20110715 PT1.2] 
     6 
     7Next month [wiki:PT1_2Report20110815 PT1.2] - [wiki:MSEReport20110815 Mgt/SE] 
     8 
     9'''Note:'''  Please place an asterisk ('''*''') after the percent if you updated this value in this report. Also, please update the "Last Updated" column even if the % complete hasn't changed; that way we'll know that the figure represents the most current information. 
     10 
     11'''Note:''' Critical? refers to level of need for Preliminary Design Review: XX = Must complete, X = Valuable to complete but already good enough,  Blank = Nice to have. 
     12 
     13|| '''Task''' || '''Critical?''' || '''Start''' || '''Finish''' || '''Resources (lead first)''' || '''% Complete''' || '''Comments''' || '''Last Updated''' || 
     14|| ''Database and Data Access Analyses'' || || || || ''Jacek Becla'' || || ''Have all the key tasks for pdr done, working on documentation'' || || 
     15|| Scalability tests phase III (up to 250 nodes) || XX || 20110303 || 20110607 || Becla Jacek[10%],Wang Daniel[75%],Dubois-Felsmann Gregory[5%] || 80% || Documentation almost ready || 20110620 || 
     16|| SSD Database Tests || || 20100802 || 20110603 || Becla Jacek || 95% || Still need to finalize the summary document  || 20110517 || 
     17|| Improve trac db documentation for PDR || X || 20090902 || 20110613 || Becla Jacek[10%] || 60% ||  || 20110620 || 
     18|| Write design document for PDR || XX || 20110614 || 20110711 || Becla Jacek[5%],Lim KT[5%],Hanushevsky Andy[20%] || 75% ||  || 20110620 || 
     19|| ''Pipeline Execution Middleware Scaling Tests'' || || || || ''KT Lim, Ray Plante'' || || || || 
     20|| Define scaling tests || || 20110222 || 20110606 || Plante Ray[5%] || 50% ||  || 20110426 || 
     21|| Create benchmark stage implementations and pipeline configurations || || 20110606 || 20110627 || Daues Greg[25%] || 0% ||  || 20110426 || 
     22|| Execute scaling tests, analzye, report results || || 20110627 || 20110718 || Daues Greg[25%] || 0% ||  || 20110426 || 
     23|| ''Pipeline Execution Monitoring Visualization Tool'' || || || || ''Ray Plante'' || || || || 
     24|| Design/acquire/review pipeline processing visualization tool || || 20110301 || 20110617 || Plante Ray[5%],Pietrowicz Steve[25%] || 75% ||  || 20110614 || 
     25|| Implement pipeline processing visualization tool || || 20110322 || 20110628 || Pietrowicz Steve[75%] || 75% || Feedback implemented || 20110614 || 
     26|| Demonstrate rescheduling of failed processing || || 20110222 || 20110628 || Pietrowicz Steve[75%] || 75% || Show in pipeline movie and in conference calls  || 20110614 || 
     27|| Create simulated worker failure mechanism || || 20110301 || 20110613 || Pietrowicz Steve[50%] || 75% ||  || 20110614 || 
     28|| Enable detection of failure and mapping to job || || 20110315 || 20110617 || Pietrowicz Steve[75%] || 75% ||  || 20110614 || 
     29|| Enable rescheduling of failed job || || 20110322 || 20110628 || Pietrowicz Steve[75%] || 75% ||  || 20110614 || 
     30|| ''MOPS Analyses'' || || || || ''Tim Axelrod'' || || || || 
     31|| Complete analysis of runs of !FindTracklets/!LinkTracklets and !OrbFit driven by simulated DIASources || || 20081010 || 20110613 || Axelrod Tim[20%],Myers Jonathan[75%] || 75% || Determined that the number of false tracks returned by LinkTracklets can be reduced by several orders of magnitude by use of a cut on prob(chisq) for the fit of the coordinates to quadratics on the sky. Significant numbers of true tracks are eliminated by || 20110425 || 
     32|| Estimate amount of CPU required for LSST MOPS || || 20101108 || 20110615 || Axelrod Tim[20%],Myers Jonathan[75%] || 75% ||  || 20110520 || 
     33|| Prototype key algorithms in MOPS design || || 20101206 || 20110706 || Axelrod Tim[20%],Myers Jonathan[75%] || 50% ||  || 20110520 || 
     34|| Determine requirements for FutureMOPS that will satisfy solar system science requirements as sketched out in SRD || || 20110117 || 20110713 || Axelrod Tim[20%],Myers Jonathan[75%] || 50% ||  || 20110425 || 
     35|| Write up results for PDR || XX || 20110714 || 20110727 || Axelrod Tim[20%],Myers Jonathan[75%] || 0% ||  ||  || 
     36|| ''Complete DM content in LSR and OSS'' || || || || ''Gregory Dubois-Felsmann'' || || || || 
     37|| Update star and galaxy counts || || 20100908 || 20110606 || Dubois-Felsmann Gregory[5%] || 75% || Ivezic/Juric analysis has been refreshed, they are awaiting one further specific question formulation from gpdf. Previous values were brought forward for the CCB action on the OSS. An update will be rolled into the expected OSS revision for the DQ require || 20110531 || 
     38|| Extract values for Data Quality Requirements  || XX || 20101020 || 20110606 || Dubois-Felsmann Gregory[5%] || 75% || On hold awaiting results from the Tyson committee. || 20110531 || 
     39|| Capture network requirements in SysML model || XX || 20110602 || 20110602 || Dubois-Felsmann Gregory[5%] || 0% ||  || 20110425 || 
     40|| Capture cyber-security requirements in SysML model || XX || 20110603 || 20110609 || Dubois-Felsmann Gregory[5%] || 0% ||  || 20110425 || 
     41|| Support establishment of traceability between LSR and OSS || || 20100901 || 20110630 || Dubois-Felsmann Gregory[15%] || 53% || Isolated improvements to traceability in conjunction with additions || 20110425 || 
     42|| Establish bounding requirements in SysML for MOPS || XX || 20101206 || 20110622 || Dubois-Felsmann Gregory[5%] || 50% || Was awaiting analysis from Tim which is apparently nearly complete now. || 20110425 || 
     43|| ''Revise DM-FRS'' || || || || ''Gregory Dubois-Felsmann'' || || || || 
     44|| Flow down OSS requirements to FRS (aka DMSR) and revise FRS accordingly || XX || 20110602 || 20110608 || Dubois-Felsmann Gregory[50%] || 0% ||  ||  || 
     45|| Restate existing quantitative requirements as constraint blocks || || 20110418 || 20110609 || Dubois-Felsmann Gregory[50%] || 75% || Needs final review. || 20110531 || 
     46|| Establish traceability of FRS to OSS (or elsewhere) || || 20110630 || 20110711 || Dubois-Felsmann Gregory[50%] || 0% || Isolated improvements to traceability in conjunction with additions || 20101020 || 
     47|| Review traceability with Tim and Chuck, clean up || || 20110711 || 20110714 || Dubois-Felsmann Gregory[50%],Axelrod Tim[50%] || 0% ||  ||  || 
     48|| ''Update Structure Model'' || || || || ''Gregory Dubois-Felsmann'' || || || || 
     49|| Update Structure Model to match revised WBS || || 20110418 || 20110602 || Dubois-Felsmann Gregory[50%] || 50% || Needs to be updated for MREFC-resubmission WBS. || 20110531 || 
     50|| Create DM internal ICD N2 diagram || || 20110603 || 20110603 || Dubois-Felsmann Gregory[50%] || 0% ||  ||  || 
     51|| Update Structure Model - FRS traceability || || 20110711 || 20110713 || Dubois-Felsmann Gregory[50%] || 0% ||  ||  || 
     52|| ''Prepare ICDs'' || || || || ''Gregory Dubois-Felsmann'' || || || || 
     53|| DM-CCS || X || 20110103 || 20110627 || Dubois-Felsmann Gregory[25%],Marshall Stuart[25%] || 33% ||  || 20110325 || 
     54|| DM-TCS || X || 20110309 || 20110630 || Sebag Jacques[50%],Dubois-Felsmann Gregory[50%] || 40% ||  || 20110325 || 
     55|| DM-OCS || X || 20110317 || 20110708 || Dubois-Felsmann Gregory[50%],Schumacher German[50%] || 40% || Need to present to DM and OCS groups || 20110325 || 
     56|| DM-EPO || X || 20110602 || 20110616 || Jacoby Suzanne[50%],Dubois-Felsmann Gregory[20%] || 0% || DM-EPO session held at AHM; significant progress in engaging larger EPO group in understanding what we need; regular DM-EPO contact initiated || 20110325 || 
     57|| DM-sites || X || 20110516 || 20110621 || Dubois-Felsmann Gregory[50%],Lambert Ron[50%],Barr Jeff[50%] || 50% ||  || 20110325 || 
     58|| DM - VAO || || 20110225 || 20110721 || Plante Ray[5%] || 50% || Draft MOU as basis for interface requirements. || 20110520 || 
     59|| ''Update App and MW Reference Design for DC3a, DC3b PT1, PT1.1'' || || || || ''Gregory Dubois-Felsmann'' || || || || 
     60|| Develop Performance Budgets, Timing/Sequence Diagrams for Alert and Data Release steady state || || 20101014 || 20110616 || Dubois-Felsmann Gregory[50%],Lim KT[75%] || 50% || Diagrams developed and quantities used in models ''but still need to be reviewed'' || 20110621 || 
     61|| Update reference design - structure model traceability || || 20110617 || 20110621 || Dubois-Felsmann Gregory[50%],Kantor Jeff[25%],Allsman Robyn[50%],Lim KT[25%],Plante Ray[25%] || 0% ||  || 20110621 || 
     62|| Update Applications UML, documentation || || 20110617 || 20110621 || Allsman Robyn[25%],Axelrod Tim[25%],Shaw Dick[25%],Lim KT[25%],Becker Andy[25%],Bickerton Steve[25%],Bosch Jim[25%],Krughoff Simon[25%],Lupton Robert[25%],Owen Russell[25%], || 0% ||  || 20110621 || 
     63|| Develop Apps sheet of DM Roadmap || || 20101125 || 20110609 || Axelrod Tim[10%],Allsman Robyn[10%] || 75% || App Status sheet developed, need more functional descriptions from Apps team, do in parallel with UML update.  || 20110520 || 
     64|| ''Update Infrastructure Reference Design'' || XX || || || ''Mike Freemon'' || || 26 infrastructure-related documents identified for PDR.  Due dates established.  Owners identified.  Critical path item is the Document-6284, the cost sheet, which is in-progress. || 20110621 || 
     65|| Update Mountain/Base Network Design || XX || 20101022 || 20110608 || Lambert Ron[20%] || 50% ||  || 20110520 || 
     66|| Update Long-Haul Network Acquisition Plans || || 20101022 || 20110606 || Lambert Ron[5%],Kantor Jeff[5%] || 25% ||  || 20010520 || 
     67|| Update Infrastructure Power, Cooling, Floor Space || XX || 20110606 || 20110615 || Lambert Ron[10%],Freemon Mike[10%] || 0% ||  || 20010520 || 
     68|| Update Infrastructure Trends Document with our position (e.g. SSD, GPU, Advanced Processor Architecture, Virtual Shared Memory) || XX || 20110616 || 20110713 || Freemon Mike[20%],Dubois-Felsmann Gregory[20%],Lim KT[20%] || 0% || In-progress || 20110621 || 
     69|| Update Computing, Storage Reference Design Documentation || XX || 20110714 || 20110810 || Freemon Mike[20%] || 0% ||  || 20010520 || 
     70|| ''Requirements and Design for Science User Interface'' || || || || ''Schuyler Van Dyk'' || || || || 
     71|| Integrate into FRS and prepare system requirements change requests to integrate || XX || 20110609 || 20110622 || Van Dyk Schuyler[5%],Dubois-Felsmann Gregory[25%],Levine Deborah[5%] || 0% || Not done yet || 20110623 || 
     72|| Create SUI architecture document || || 20050901 || 20110628 || Van Dyk Schuyler[5%],Dubois-Felsmann Gregory[25%],Levine Deborah[5%] || 75% ||under review  || 20110623 || 
     73|| Create sample use cases, domain model || || 20110706 || 20110707 || Levine Deborah[50%],Rosenberg Doug [25%] || 0% || TBD 7/6|| 20110623 || 
     74|| Collate existing (best-of-breed)  technology options with requirements || || 20110418 || 20110622 || Van Dyk Schuyler[50%],Dubois-Felsmann Gregory[5%],Levine Deborah[50%] || 50% || in progress || 20110623 || 
     75|| Review with SAT, update and re-baseline || || 20110623 || 20110706 || Van Dyk Schuyler[50%],Dubois-Felsmann Gregory[50%],Levine Deborah[50%] || 0% ||  || 20110623 || 
     76|| Update SUI WBS || || 20110707 || 20110711 || Van Dyk Schuyler[50%],Kantor Jeff[50%] || 0% ||  || 20110623 || 
     77|| ''DM Test Plans'' || || || || ''Robyn Allsman'' || || || || 
     78|| Draft DM Unit Test documents || || 20100930 || 20110707 || Allsman Robyn[25%] || 50% || Updated SDP's DM V&V section to include test implementation responsibility during DC and Construction. NOT YET APPROVED by TCT/SAT/etc.  || 20110520 || 
     79|| Draft DM Integration Test documents || || 20101014 || 20110714 || Allsman Robyn[25%] || 50% || Draft is outlined and 75% fleshed out. || 20110520 || 
     80|| Draft DM System Test documents || || 20110715 || 20110719 || Allsman Robyn[35%] || 0% ||  || 20110520 || 
     81|| Draft DM Acceptance Test documents || X || 20110720 || 20110726 || Allsman Robyn[25%] || 0% ||  || 20110520 || 
     82|| Generate Integration Test Cases from DM Ref Design Use Cases/Activities || || 20110519 || 20110728 || Allsman Robyn[50%] || 75% ||  || 20110520 || 
     83|| Create Performance System Test Cases from DM Subsystem Requirements Constraint Blocks || || 20110728 || 20110804 || Allsman Robyn[50%] || 0% ||  || 20110520 || 
     84|| Generate Functional Acceptance Test Cases from DM Subsystem Requirements || || 20110804 || 20110811 || Allsman Robyn[50%] || 0% ||  || 20110520 || 
     85|| ''Update DM Sizing Model'' || XX || || || ''Mike Freemon'' || || In-progress (see above for additional details) || 20110621 || 
     86|| Update Science workbook and explanation document || || 20110228 || 20110606 || Dubois-Felsmann Gregory[10%],Axelrod Tim[10%] || 50% || Numbers and basic requirements updated in expectation of reorganization, final object counts.  || 20110325 || 
     87|| Update Technology Trends workbook and explanation document || XX || 20110602 || 20110608 || Freemon Mike[20%] || 0% || In-progress (see above for additional details) || 20110621 || 
     88|| Consolidate and update Computing workbook and explanation document || || 20110222 || 20110606 || Lim KT[20%] || 75% || Workbook ready for internal review; document in progress || 20110621 || 
     89|| Consolidate and update I/O and Storage workbook and explanation document || || 20110222 || 20110602 || Lim KT[10%],Becla Jacek[10%],Axelrod Tim[10%] || 80% || Consolidation complete; restructuring mostly done. Please note: a lot more work has been done than originally planned - the model has been completely redone, it is much better, and more detailed. || 20110516 || 
     90|| Update Network workbook and explanation document, integrate into sizing model sheets || || 20110222 || 20110603 || Lambert Ron[20%],Kantor Jeff[10%] || 71% || Updated with REUNA being paid in MREFC phase.  In discussion with AmLight for similar for SCL - MIA. || 20110520 || 
     91|| ''Complete DM Inputs to Risk Management, System Integration, Commissioning, and Operations Plans'' || || || || ''Jeff Kantor'' || || || || 
     92|| Update DM parts of LSST System Integration Test Plan  || X || 20101022 || 20110615 || Allsman Robyn[30%],Freemon Mike[10%],Kantor Jeff[5%] || 0% ||  || 20110421 || 
     93|| Contribute DM sections to LSST Commissioning, I&T, and Operations Plans || X || 20100416 || 20110629 || Dubois-Felsmann Gregory[20%],Kantor Jeff[10%],Allsman Robyn[20%],Axelrod Tim[20%],Plante Ray[20%],Freemon Mike[20%]] || 50% ||  || 20110520 || 
     94|| Contribute DM sections to LSST Risk Management Plan and register || XX || 20100416 || 20110608 || Kantor Jeff[10%],Allsman Robyn[20%],Axelrod Tim[20%],Plante Ray[20%],Freemon Mike[20%],Dubois-Felsmann Gregory[20%] || 50% ||  || 20110520 || 
     95|| Update/Get MOUs with resource support/commitment from DM partners: NCSA || XX || 20110602 || 20110629 || Kantor Jeff[5%],Freemon Mike[5%] || 0% ||  || 20110421 || 
     96|| ''System Architecture Team'' || || || || ''Gregory Dubois-Felsmann'' || || || || 
     97|| Routine SAT operations/design reviews || || 20100409 || 20110602 || Dubois-Felsmann Gregory[0%] || 0% ||  ||  || 
     98|| ''Vacations'' || || || ||  ||  ||  ||  || 
     99|| Vacations 1st half June || || 20110601 || 20110615 || Freemon Mike[50%] || 0% ||  ||  || 
     100|| Vacations 2nd half June || || 20110616 || 20110630 || Axelrod Tim[50%],Allsman Robyn[80%] || 0% ||  ||  || 
     101|| Vacations 1st half July || || 20110701 || 20110715 || Plante Ray[20%] || 0% ||  ||  || 
     102|| Vacations 2nd half July || || 20110718 || 20110801 || Freemon Mike[50%] || 0% ||  ||  || 
     103|| Vacations 1st half August || || 20110802 || 20110816 ||  || 0% ||  ||  || 
     104|| Vacations 2nd half August || || 20110817 || 20110831 ||  || 0% ||  ||  || 
     105|| Vacations 1st half September || || 20110901 || 20110915 ||  || 0% ||  ||  || 
     106|| Vacations 2nd half September || || 20110916 || 20110930 ||  || 0% ||  ||  || 
     107|| ''PDR material preparation'' || || || || ''Jeff Kantor'' || || || || 
     108|| Ensure all documents in docushare updated || XX || 20110728 || 20110802 || Kantor Jeff[25%],Axelrod Tim[25%],Plante Ray[25%],Freemon Mike[25%],Dubois-Felsmann Gregory[25%],Allsman Robyn[25%],Becla Jacek[25%],Lim KT[25%] || 0% ||  || 20110421 || 
     109|| Update PMCS II DM FDP project || || 20110728 || 20110803 || Kantor Jeff[5%],Claver Chuck[5%],Jacoby Suzanne[5%],Krabbendam Victor[5%],Kurita Nadine[5%] || 0% ||  || 20110421 || 
     110|| Create PDR presentations || XX || 20110728 || 20110802 || Kantor Jeff[25%],Axelrod Tim[25%],Plante Ray[25%],Freemon Mike[25%],Dubois-Felsmann Gregory[25%],Allsman Robyn[25%],Becla Jacek[25%],Lim KT[25%],Van Dyk Schuyler[25%] || 0% ||  || 20110421 || 
     111|| Conduct Director's Review || XX || 20110719 || 20110721 || Kantor Jeff[25%],Axelrod Tim[25%],Plante Ray[25%],Freemon Mike[25%],Dubois-Felsmann Gregory[25%],Allsman Robyn[25%],Becla Jacek[25%],Lim KT[25%],Van Dyk Schuyler[25%] || 0% ||  ||  || 
     112|| Update DM Presentations || XX || 20110728 || 20110818 || Kantor Jeff[25%],Axelrod Tim[25%],Plante Ray[25%],Freemon Mike[25%],Dubois-Felsmann Gregory[25%],Allsman Robyn[25%],Becla Jacek[25%],Lim KT[25%] || 0% ||  || 20110421 || 
     113|| Dry Run DM Presentations || XX || 20110819 || 20110825 || Kantor Jeff[25%],Axelrod Tim[25%],Plante Ray[25%],Freemon Mike[25%],Dubois-Felsmann Gregory[25%],Allsman Robyn[25%],Becla Jacek[25%],Lim KT[25%],Van Dyk Schuyler[25%] || 0% ||  || 20110421 || 
     114|| Conduct PDR || XX || 20110826 || 20110901 || Kantor Jeff[80%],Axelrod Tim[80%],Van Dyk Schuyler[80%],Plante Ray[80%],Freemon Mike[80%],Dubois-Felsmann Gregory[80%],Allsman Robyn[80%],Becla Jacek[80%],Lim KT[80%] || 0% ||  || 20110421 || 
     115 
     116 
     117== Other Activity ==