    6666|| ''Update App and MW Reference Design for DC3a, DC3b PT1, PT1.1'' || || || ''Allsman Robyn'' || || || 20110315 || 
    6767|| Update reference design from DC3a and DC3b model || 20100930 || 20110304 || Lim KT[25%],Axelrod Tim[10%],Plante Ray[10%],Allsman Robyn[25%],Dubois-Felsmann Gregory[10%] || 100%* || Completed February 2011 || 20110315 || 
    68 || Develop Performance Budgets, Timing/Sequence Diagrams for Alert and Data Release steady state || 10/14/10 || 3/22/11 || Dubois-Felsmann Gregory[50%],Lim KT[75%] || 50% || Diagrams developed but quantities need to be reviewed || 20110323 |||| Update reference design - structure model traceability || 20110323 || 20110325 || Dubois-Felsmann Gregory[50%],Kantor Jeff[25%],Allsman Robyn[50%],Lim KT[25%],Plante Ray[25%] || 0% ||  ||  || 
     68|| Develop Performance Budgets, Timing/Sequence Diagrams for Alert and Data Release steady state || 10/14/10 || 3/22/11 || Dubois-Felsmann Gregory[50%],Lim KT[75%] || 50% || Diagrams developed but quantities need to be reviewed || 20110323 || 
     69|| Update reference design - structure model traceability || 20110323 || 20110325 || Dubois-Felsmann Gregory[50%],Kantor Jeff[25%],Allsman Robyn[50%],Lim KT[25%],Plante Ray[25%] || 0% ||  ||  || 
    6970|| ''Update  Infrastructure Reference Design'' || || || ''Freemon Mike'' || || interface sheets now frozen; new requirements (actual values for the infrastructure requirements being worked on; work continues in parallel on design diagrams and restructuring of the internals of the cost sheet || 20110323 || 
    7071|| Update Mountain/Base Network Design || 20101022 || 20110301 || Lambert Ron[20%] || 50% || Updated design to show increase to 100 Gbps midway in operations.  || 20110323 ||