Changes between Version 28 and Version 29 of InfrastructureWGMeetingD20091026


Ignore:
Timestamp:
10/27/2009 03:12:54 PM (10 years ago)
Author:
mfreemon
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • InfrastructureWGMeetingD20091026

    v28 v29  
    7373  * change control, granularity mismatch, signoff, etc. 
    7474 * update cost sheet to include all elements of the MREFC non-labor infrastructure costs (in order to eliminate "column C" of the cost sheet) (MikeF) 
    75  * change terminology in the cost sheet from "Operations" to "Operating" (MikeF) 
    76   * Jeff: after further thinking, I would like to counterpropose the term "O&M" 
     75 * change terminology in the cost sheet away from "Operations" (MikeF) 
    7776 * think through the pros/cons of including the (MREFC) development cluster and the integration cluster in these sheets/this process (MikeF) 
    7877 * MikeF will get direct access to Primavera