Apps Status Report for January 15, 2010

Guide on Reporting Percentage Completed:

For software development tasks,

  • use 0% if the solution is still being designed;
  • use 25% if the solution's design is completed;
  • use 50% if the solution is implemented and tested within the Ticket branch;
  • use 75% if the implementation review is complete, the Ticket branch has been merged onto the Trunk branch, and the Ticket is closed.
  • use 100% if the affected Trunk packages are tagged and released.

For other tasks, still use these increments, but apply their meaning as best as possible.

Note: Please place an asterisk (*) after the percent if you updated this value in this report.

Allsman Robyn

Reported 20/Jan/10

IDPercentTaskComments
APP2040%identify scientists to analyze stage outputnot started
APP2000%validate initial integration run successfully completednot started

*Percent updated in this report

Comments:

Other Activities

  • DM TCT activities
    • update C++ Standards Document per TCT 13 Jan meeting
  • Standards Checking
    • continued to handle Standards Checking for C++ and Python language use
    • wrote StandardsChecking/Setup describing Parasoft setup for Parasoft CLI standards checking
    • requested that Parasoft and Pylint Standards Checking be integrated into the buildbot environment.
  • Enterprise Architect
    • moving the existing DC3b activity flow model into alignment with KTL's dataflow model
  • Software Release Project Plan

Axelrod Tim

Reported xx/xx/xx

IDPercentTaskComments
APP1550%photometric self calibrationnot started
APP1590%evaluate tools and make selectionnot started
APP1580%configure and test for HEALpix projectionnot started
APP1610%configure and test for display of full focal plane LSST imagenot started
APP560%defining unitsnot started
APP9180%define DC3b goals for SDQA
APP19150%Provide special case simulation needs (Axelrod)

*Percent updated in this report

Comments:

Other Activities

Becker Andy

Reported 01/19/10

IDPercentTaskComments
APP145*75%move applications code out of stage code
APP8075%adapt PSF spatial cell model for ip_diffim
APP7975%implement sum-of-gaussians (Alard-Lupton) kernel basis
APP78*75%investigate regularizing delta function kernels
APP95*25%code to measure quality of difference imaging coadds
APP1000%test difference imaging coaddsnot started
APP1230%find CFHT fringe frames and move to NCSAnot started

*Percent updated in this report

Comments:

Other Activities

Becla Jacek

Reported 01/21/10

IDPercentTaskComments
APP5375%schema updates for all source related tables and object table
APP540%schema updates for all exposure related tablesnot started
APP55N/A*synthetic sources of dataPer Tim (DataAccWG telecon Jan 15, 2010) this is not needed for DC3b. Planning to do after DC3b.
APP560%defining unitsnot started
APP5775%standardizing names

*Percent updated in this report

Comments:

See MW report.

Other Activities

Bickerton Steve

Reported xx/xx/xx

IDPercentTaskComments
APP11225%stellar photometry

*Percent updated in this report

Comments:

Other Activities

Bosch Jim

Reported xx/xx/xx

IDPercentTaskComments
APP10875%implement convolved Sersic models
APP10750%implement multifit fitter
APP1170%implement constrained models for forced photometrynot started
APP1160%create LSST stages for photometrynot started

*Percent updated in this report

Comments:

Other Activities

Cleveland Matt

Reported xx/xx/xx

IDPercentTaskComments
APP1540%develop distributed linkTracklets implementationnot started

*Percent updated in this report

Comments:

Other Activities

Dubcovsky Martin

Reported 01/20/09

IDPercentTaskComments
APP150100%move applications code out of stage code
APP168100%modify stage code to conform with new MW API
APP109100%complete API for model fitting with marginalization over calibration parameters
APP10875%implement convolved Sersic modelsPoint source model work is complete
APP107*100%implement multifit fitter
APP11825%implement multifit pipeline which leverages multifit API and image access framework
APP1190%implement pipeline stage for extracting elllipse parameters, flux, and bounding box from detectionsnot started
APP1170%implement constrained models for forced photometrynot started
APP1160%create LSST stages for photometrynot started

*Percent updated in this report

Comments:

First complete implementation! Can only fit Point-Source models but it's a start. Will be slowing down development slightly in order to catch up the documentation, and clean up the code

Other Activities

Grav Tommy

Reported xx/xx/xx

IDPercentTaskComments
APP1340%generate PS-SSM catalog for LSSTnot started

*Percent updated in this report

Comments:

Other Activities

Jarvis Mike

Reported xx/xx/xx

IDPercentTaskComments
APP10525%PSF for deep detection

*Percent updated in this report

Comments:

Other Activities

Jones Lynne

Reported xx/xx/xx

IDPercentTaskComments

*Percent updated in this report

Comments:

Other Activities

Krughoff Simon

Reported 01/29/10

IDPercentTaskComments
APP146*75%move applications code out of stage code
APP840%apply fringe frame correctionnot started
APP8350%develop camera state classes (CCDinfo and Ampinfo)
APP8225%develop calibration products database classes

*Percent updated in this report

Comments:

Other Activities

Laher Russ

Reported 01/29/10

IDPercentTaskComments
APP212100%Update SDQA package to confirm with C++ standardsCompleted.
APP900%implement SDQA tool functionality to support DC3b goalsnot started
APP890%query metadata and package in C++ containernot started
APP880%implement threshold comparisionnot started
APP21150%WCS verification code Development continuing.
APP21075%ATpy evaluationPut on the back burner.

*Percent updated in this report

Comments:

  • Attended DC3b data-validation meeting with Deborah, Jeonghee, Dick, Robyn, Tim and Jeff in Tucson Jan 12 & 13.
  • Documented design of SDQA WCS verification stage in SdqaWcsFailureCheckStage.
  • Implemented Trac ticket #1084 (skeletal stage for SDQA WCS verification).
  • Developed and tested unit test for SDQA WCS verification stage.
  • Working now on fleshing out SDQA WCS verification stage (Trac ticket #1147).

Other Activities

Suzy Dodd

-Schuyler, Suzy attended NSF Review in Tucson. -Schuyler, Suzy, Lee attended LSST Session at AAS. -Schuyler getting up to speed on LSST. He lead two Apps WG meetings while Robert in Japan. Supported the usual meetings and reporting.

Levine Deborah

Reported 01/19/10

IDPercentTaskComments
APP900%implement Dc3b processing validation tool functionality to support DC3b goalsnot started

*Percent updated in this report

Comments:

Met with Tim and Jeff in Tucson Jan 12 & 13. Decided to emphasize activities that support validation of the pipeline processing for DC3b, especially comparison to "truth" as captured in the simulator inputs. A list of actions has been generated, prioritized and circulated and a list of specific tasks for the formerly SDQA, now Analysis Support group. These are currently being sized and we will determine how far down the priority list we believe we can get fro the various stages of DC3b.

Other Activities

Lim KT

Reported xx/xx/xx

IDPercentTaskComments
APP60%interslice communicationsnot started
APP70%post spatial matching (stretch goal)not started
APP1920%translate overall production into pipeline , stages, and policiesnot started

*Percent updated in this report

Comments:

Other Activities

Lupton Robert

Reported xx/xx/xx

IDPercentTaskComments
APP1390%integrate HEALPix into software stacknot started
APP9540%code to measure quality of difference imaging coadds
APP1000%test difference imaging coaddsnot started
APP14980%move applications code out of stage code
APP1670%modify stage code to conform with new MW APInot started
APP10175%simplified background estimation
APP12150%adapt astrometry code for DC3b use

*Percent updated in this report

Comments:

Other Activities

Monet Dave

Reported xx/xx/xx

IDPercentTaskComments
APP12150%adapt astrometry code for DC3b use

*Percent updated in this report

Comments:

Other Activities

Monkewitz Serge

Reported xx/xx/xx

IDPercentTaskComments
APP1440%move applications code out of stage codenot started
APP1620%modify stage code to conform with new MW APInot started
APP60%interslice communicationsnot started
APP70%post spatial matching (stretch goal)not started
APP740%characteriztion of and improvements to association cosmic ray rejection performancenot started

*Percent updated in this report

Comments:

Other Activities

Mullally Fergal

Reported xx/xx/xx

IDPercentTaskComments
APP8660%implement improvements for WCS
APP15125%implement stage structure for support astrometry code

*Percent updated in this report

Comments:

Other Activities

Myers Jon

Reported xx/xx/xx

IDPercentTaskComments
APP14025%integrate MOPS stages with new C++ KD-Tree tools
APP129*35%run DayMOPS with solar system model
APP14175%write linkTracklets and unit tests

*Percent updated in this report

Comments:

  • Generated resource requirement estimates for DC3b with Lynne, Tim, DB folks
  • Sent request for new pyoorb function to Mikael Granvik
  • Discovered missing, needed fields with current DIASource specification, discussed with DB crew
  • Ingested new full-density LSST data covering a subsets of fields, generated by Lynne
  • Ran DayMOPS with full-density LSST data covering only a subset of fields, found it to swap out.
  • Pulled LSST data out and used command-line versions to research new parameters which will work better, chronicled results at MopsRunlog
  • Discovered potential problems with tracklet linking over a 30-day window; fortunately, validated that <= 20 days is fast and generates a tractable number of tracks
  • Discovered, isolated some data sets which cause findTracklets (C version) to crash on my machine
  • Worked with Matt to generate a more thorough plan for distributing linkTracklets

Other Activities

Owen Russ

Reported xx/xx/xx

IDPercentTaskComments
APP770%fix ticket #873not started
APP940%code to warp images to/from sky pixel representationnot started
APP2090%implement outlier rejection not started
APP9850%code to create PSF-matched difference imaging coadds (no outlier rejection)
APP9540%code to measure quality of difference imaging coadds
APP10450%code to detect chi-squared deep detection coadds (no outlier rejection)

*Percent updated in this report

Comments:

-Finished ticket #606 (convert afw to use minuit2) and merged to trunk.

Worked on coadds (coadd_utils, coadd_psfmatched, coadd_chisquared and coadd_pipeline):

  • Implemented outlier rejection stage
  • Expanded coadd_utils
  • Fixed an image weighting bug
  • Worked around an afw bug (#1121)
  • Supported Ray Plante's resource allocation runs

These packages are now ready to be tagged, but I cannot tag them until we have tagged versions of ip_diffim and afw.

-Worked on afw some, cleaning things up, supplying a workaround for bug #1121 (not a complete fix, but it does the job in many cases), testing changes. Also Jim Bosch and I patched meas_astrom to work with trunk afw.

-I am working on HEALPix, but that is going slowly.

Plans for next month:

  • Tag and release the first versions of coadd_chisquared, coadd_psfmatched and coadd_pipeline (once afw and ip_diffim are tagged)
  • Code to allow use of HEALPix

Other Activities

Pierfederici Francesco

Reported xx/xx/xx

IDPercentTaskComments

*Percent updated in this report

Comments:

Other Activities

TBD

Reported xx/xx/xx

IDPercentTaskComments
APP1030%create a set of chi-squared deep detection coaddsnot started
APP1020%code to measure quality of deep detection coaddsnot started
APP2080%define CFHT to be usednot started
APP2010%identify tools to analyze science data quality of stage outputnot started
APP1990%validate science quality of initial integration runnot started

*Percent updated in this report

Comments:

Other Activities

Major Accomplishments

Significant breakthroughs, issues resolved.



Objectives for the Next Period

What you expect to accomplish.



Problems Encountered and Solutions Being Pursued

Budget or schedule variance, technical issues, management issues.